RAMS (Risk Assessments & Method Statements)
Apex Lift Solutions Ltd provides professional written Risk Assessments and Method Statements (RAMS) to support safe, compliant, and controlled lifting and construction activities across the UK and internationally.
RAMS Services
Our RAMS services are designed to support complex lifting operations, construction activities, and offshore works by clearly identifying hazards, defining control measures, and establishing safew systems of work.
All documentation is practical, site-focused, and aligned with the realities of live operations – not generic,
Risk Assessments & Method Statements
Apex Lifting Solutions Ltd develops detailed, task-specific Risk Assessments and Method Statements to support lifting operatins, crane activities, rigging works, and associated site tasks.
Each RAMS package is produced following a structured approach, identifying hazards, assessing risk levels, and implementing proportionate contreol measures to reduce risk to as low as reasonably practicable.
Method Statements clearly define the sequence of works, roles, and responsibilities, equipment requirements, exclusion zones, emergency arrangements, and interfaces with other contractors or activities.
Standards, Compliance & Review
- LOLER & PUWER Compliance
- RAMS Authorising, Review, and Approval
- Integration with lift plans and crane studies
- Contractor ands site-specific RAMS
- Task-based and project-specific documentation
- Ongoing RAMS review and updates as site conditions change
RAMS documentation is produced in line with current UK legislation, industry best practise, and relevantoffshore standards, ensuring clarity, compliance, and effective operational control at all times.
All RAMS documentaion is authored and reviewed by experienced lifting professionals with direct site and offshore operational experience.
