RAMS (Risk Assessments & Method Statements)
Apex Lift Solutions Ltd provides professional written Risk Assessments and Method Statements (RAMS) to support safe, compliant, and controlled lifting and construction activities across the UK and internationally.
RAMS Services
Our RAMS services are designed to support complex lifting operations, construction activities, and offshore works by clearly identifying hazards, defining control measures, and establishing safew systems of work.
All documentation is practical, site-focused, and aligned with the realities of live operations – not generic,
Risk Assessments & Method Statements
Apex Lifting Solutions Ltd develops detailed, task-specific Risk Assessments and Method Statements to support lifting operatins, crane activities, rigging works, and associated site tasks.
Each RAMS package is produced following a structured approach, identifying hazards, assessing risk levels, and implementing proportionate contreol measures to reduce risk to as low as reasonably practicable.
Method Statements clearly define the sequence of works, roles, and responsibilities, equipment requirements, exclusion zones, emergency arrangements, and interfaces with other contractors or activities.
Example extract from a task-specific risk assessment used within our RAMS documentation. All RAMS are tailored to site conditions, lifting activities and client requirements.
Standards, Compliance & Review
- LOLER & PUWER Compliance
- RAMS Authorising, Review, and Approval
- Integration with lift plans and crane studies
- Contractor ands site-specific RAMS
- Task-based and project-specific documentation
- Ongoing RAMS review and updates as site conditions change
RAMS documentation is produced in line with current UK legislation, industry best practise, and relevantoffshore standards, ensuring clarity, compliance, and effective operational control at all times.
All RAMS documentaion is authored and reviewed by experienced lifting professionals with direct site and offshore operational experience.
Why Professional RAMS Matter
Poorly written or generic RAMS are one of the biggest delays, non-compliance and unsafe lifting operations. Our RAMS are written by a competent Appointed Person (AP) with real onshore and offshore experience, ensuring your documentation is practical, accurate and aligned with the realities of the job.
Our RAMS provide:
- Clear identification of task-specific hazards
- Practical, achievable control measures
- Step-by-step safe systems of work
- Integration with lift plans, rigging studies and site constraints
- Compliance with LOLER, PUWER and BS7121
- Documentation that supervisors and rigging teams can actually use on site
Whether you need RAMS for a single lift, a complex removal/installation or a multi-stage operation, we can ensure your documentation is clear, compliant and ready for approval.
ALL RAMS are written to the same standard – clear, compliant, and ready for site execution.
